Search scope:
排序: Display mode:
China's High Dams Construction and Research on Science and Technology
Chen Zongliang
Strategic Study of CAE 2000, Volume 2, Issue 12, Pages 84-89
Keywords: hydroelectric power high dam gravity dam arch dam roller compacted concrete dam (RC-CD) concrete facerockfill dam (CFRD)
Key Technical Issues Related to Super-high Concrete Slab Dam
Ma Hongqi,Cao Keming
Strategic Study of CAE 2007, Volume 9, Issue 11, Pages 4-10
Keywords: concrete slab dam super-high dam technology
Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane
Peter TSCHERNUTTER
Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 1, Pages 63-70 doi: 10.1007/s11709-010-0016-3
Keywords: embankment dam bituminous concrete membrane rock-fill material properties deformation behavior
Intelligent compaction theory of high roller compacted concrete dam
Liu Donghai,Li Bingyang,Cui Bo
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 74-79
Keywords: roller compacted concrete(RCC)dam quality control intelligent compaction real-time monitoring real-time
Technical Progress on Researches for the Safety of High Concrete-Faced Rockfill Dams
Hongqi Ma,Fudong Chi
Engineering 2016, Volume 2, Issue 3, Pages 332-339 doi: 10.1016/J.ENG.2016.03.010
The concrete-faced rockfill dam (CFRD) is an important dam type in the selection of high dams to bem ultra-high CFRDs.m ultra-high CFRDs, and suggests focuses and general ideas for future research.
Keywords: High concrete-faced rockfill dam Safety Technical progress
Key Technologies in the Design and Construction of 300 m Ultra-High Arch Dams
Renkun Wang
Engineering 2016, Volume 2, Issue 3, Pages 350-359 doi: 10.1016/J.ENG.2016.03.012
Starting with the Ertan arch dam (240 m high, 3300 MW) in 2000, China successfully built a total ofhigh water pressures, high seismic design criteria, and complex geological conditions.m ultra-high arch dams, including the strength and stability of foundation rock, excavation of the dambase and surface treatment, dam shape optimization, safety design guidelines, seismic analysis and design, treatment of a complex foundation, concrete temperature control, and crack prevention.
Keywords: Ultra-high arch dam Shape optimization Arch dam overall safety Seismic safety Concrete temperature control
Three-dimensional seismic response analysis of a concrete-faced rockfill dam on overburden layers
Dakuo FENG, Ga ZHANG, Jianmin ZHANG,
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 2, Pages 258-266 doi: 10.1007/s11709-010-0031-4
Keywords: concrete-faced rockfill dam (CFRD) overburden layer dynamic analysis finite element method (FEM)
Research on key construction technologies of concrete dam heightening project
Zhou Hougui
Strategic Study of CAE 2012, Volume 14, Issue 7, Pages 87-92
Based on construction practice of worldwide concrete dam heightening project, 4 key construction technologiesof concrete gravity dam heightening project by the integral heightening mode on the existing dam bythe down stream side and on the dam crest were systematically summarized.The 4 key technologies are concrete raw materials and mix proportion, jionting between new concrete andexisting concrete, controlled demolition and transference of old structures, and resources temporal
Keywords: construction technology dam heightening concrete dam hydraulic and hydropower engineering
Analysis of arch dam deformations
Franz PERNER, Pius OBERNHUBER,
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1, Pages 102-108 doi: 10.1007/s11709-010-0012-7
Keywords: arch dam analysis Zillergruendl concrete temperature hybrid model
Features of seismic hazard in large dam projects and strong motion monitoring of large dams
Martin WIELAND,
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1, Pages 56-64 doi: 10.1007/s11709-010-0005-6
Keywords: seismic hazard arch dam concrete face rockfill dam strong motion instrumentation reservoir-triggered
Feng Jin, Duruo Huang, Michel Lino, Hu Zhou
Engineering 2024, Volume 32, Issue 1, Pages 100-106 doi: 10.1016/j.eng.2023.09.020
Over the past few decades, one of the most significant advances in dam construction has been the inventionof the rock-filled concrete (RFC) dam, which is constructed by pouring high-performance selfcompactingconcrete (HSCC) to fill the voids in preplaced large rocks. The innovative use of large rocks in dam construction provides engineers with a material that Prospects for next-generation concrete dams are discussed from the perspectives of environmental
Keywords: Rock-filled concrete dam Pouring compactness Effect of large rocks Intelligent quality control Unmanneddam construction
Key technologies of real-time construction control for major hydraulic and hydroelectric projects
Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 20-27
Keywords: high core rock-fill dam high concrete dam construction quality construction schedule real-time monitoring digital dam
New concept of design for high concrete face rockfill dams
Li Nenghui
Strategic Study of CAE 2011, Volume 13, Issue 3, Pages 12-18
Based on analysis of experimential design for concrete face rockfilldams and its imperfection, a new design concept of high concrete face rockfill dams which includes stability
Keywords: concrete face rockfill dam design concept stability safety seepage safety deformation safety
Challenges of high dam construction to computational mechanics
ZHANG Chuhan
Frontiers of Structural and Civil Engineering 2007, Volume 1, Issue 1, Pages 12-33 doi: 10.1007/s11709-007-0002-6
Keywords: reservoir engineering hydro-power development state-of-the-art computational earthquake
Qixiang FAN
Frontiers of Engineering Management 2017, Volume 4, Issue 2, Pages 231-237 doi: 10.15302/J-FEM-2017103
Keywords: super-high arch dam intelligent construction mass concrete temperature control structure behavior control anti-erosion concrete low-heat portland cement large-discharge and high-velocity spillway tunnels large
Title Author Date Type Operation
China's High Dams Construction and Research on Science and Technology
Chen Zongliang
Journal Article
Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane
Peter TSCHERNUTTER
Journal Article
Intelligent compaction theory of high roller compacted concrete dam
Liu Donghai,Li Bingyang,Cui Bo
Journal Article
Technical Progress on Researches for the Safety of High Concrete-Faced Rockfill Dams
Hongqi Ma,Fudong Chi
Journal Article
Key Technologies in the Design and Construction of 300 m Ultra-High Arch Dams
Renkun Wang
Journal Article
Three-dimensional seismic response analysis of a concrete-faced rockfill dam on overburden layers
Dakuo FENG, Ga ZHANG, Jianmin ZHANG,
Journal Article
Research on key construction technologies of concrete dam heightening project
Zhou Hougui
Journal Article
Features of seismic hazard in large dam projects and strong motion monitoring of large dams
Martin WIELAND,
Journal Article
A Brief Review of Rock-Filled Concrete Dams and Prospects for Next-Generation Concrete Dam Construction
Feng Jin, Duruo Huang, Michel Lino, Hu Zhou
Journal Article
Key technologies of real-time construction control for major hydraulic and hydroelectric projects
Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai
Journal Article